Valley Community Recycling Center
Project Type: Local Goverment
Completion:Oct 2010
Contract Value: $ 3,650,000
Location: 9465 E Chanlyut Circle Palmer, AK
Client: Matanuska Susitna Borough
Scope: New two level steel frame recycling facility with continuous cast in place concrete footings and foundation. The facility will be approximately 23,600 square feet and built to a Gold LEED standard. The main structure will be an American Buildings pre-manufactured building with 6 inch insulated metal panels on both the roof and walls.
The center will function as a collection site and processing plant for recyclable items. The recycling facility is also being built with the following systems in planning, Solar Aquatic Sewage System, Wood Fire Boiler, Wind Turbines, and Solar (Panels, Thermal)
|