Current Projects

SORT BY: NAME DATE VALUE 

176th Wing Training Fire Facilty

Project Type: Federal
Completion:Oct 2010
Contract Value: $ 2,983,182
Location: Elmendorf AFB, AK
Client: AK Army National Guard
Scope: Work includes new construction of an approximately 5,700 square foot 176th Wing Training fire station. This new facility consists of a one story side with three apparatus bays and a two story side of support/office spaces. The facility will house 176th Wing CES/CEF personnel engaged in fire training activities. The required functional areas include administrative offices; three apparatus/vehicle bays (approximately 2,100 Square Feet); and miscellaneous spaces/shops. The drive through apparatus vehicle bays consists of overhead doors, compressed air drops, and water connections. The building is a pre-engineered American Building with pre-finished metal roofing panels.


Add/Alter Hangar 18 Squadron Operation & Aircraft Maintenance Facility

Project Type: Federal
Completion:Oct 2010
Contract Value: $ 11,042,000
Location: 17470 Airlifter Drive Elmendorf AFB, AK
Client: AK National Guard
Scope: New LEED Silver three story 15,147sf office building addition and complete interior demolition and remodel of 40,185sf three story office building. Includes Micropile Foundation, Mass Notification, SIPRNET, NIPRNET & IDS systems throughout building with classified office locations. Includes high-end finishes and Meridian Systems Automated Logic Controls throughout building.


Alter Bldg 8515 for Supply, Security Forces Communication

Project Type: Federal
Completion:Oct 2010
Contract Value: $ 7,588,000
Location: 8515 Saville Avenue Elmendorf AFB, AK
Client: AK Army National Guard
Scope: Complete interior demolition and remodel of 59,280sf building. New remodel includes complete rebuild of interior with new13,680sf steel mezzanine addition. Total office area 52,960sf with 20,000sf of warehouse space. Mass Notification and IDS systems throughout the building. Includes high-end finishes and Meridian Systems Automated Logic Controls throughout building.


Valley Community Recycling Center

Project Type: Local Goverment
Completion:Oct 2010
Contract Value: $ 3,650,000
Location: 9465 E Chanlyut Circle Palmer, AK
Client: Matanuska Susitna Borough
Scope: New two level steel frame recycling facility with continuous cast in place concrete footings and foundation. The facility will be approximately 23,600 square feet and built to a Gold LEED standard. The main structure will be an American Buildings pre-manufactured building with 6 inch insulated metal panels on both the roof and walls. The center will function as a collection site and processing plant for recyclable items. The recycling facility is also being built with the following systems in planning, Solar Aquatic Sewage System, Wood Fire Boiler, Wind Turbines, and Solar (Panels, Thermal)